This provides a general overview of project flow and timing for building. Specifics can vary a lot from project to project depending on the scope and scale. This process varies depending on which building service method (listed here previously), that you choose. However, six to twelve months is typical for this phase of the process. Concept-Design Process Reviewing preliminary plans …
Building on the Big Island: Step 4 – Pick the Degree of Your Involvement in the Construction Process
After choosing the level of service you need from your builder, the next step is deciding how much involvement you want to have in the construction process. Here are some options: OPTION 1 – OWNER/BUILDER You are responsible for every aspect of the construction process; from plans, permitting, financing, and getting bids. The construction management and liability including workman’s compensation …
Building on the Big Island: Step 3 – Choose the Building Service That’s Right for You
The next step in the building process is determining the level of service you need from your builder. This typically falls into one of the four options below: OPTION 1 – WE DESIGN + BUILD This is 100% “designed and built-for-you” full service – This means you come to us with an idea or rough floor plan, and we’ll take …